CP-3 Chemical Injection Skid

1999

Scope of Work: Replacement of all the G.I conduit cabling system within the pump skid with amoured cabling installed on cable trays, glanding, termination and assist vendor’s on commissioning.

Previous
C-91 Tutong Barrage
Next
BSP COGD CPRP-11 (740T)