C-91 Tutong Barrage

1999

Scope of Work: Supply and install of Barrage Lock Gate, Sludge Tank level control and Salinity Gauging Station control systems.

Previous
C-73 Mengkabau Water Treatment Works (30MLD)
Next
CP-3 Chemical Injection Skid