Selasha-Platform Project, Kuching, Malaysia

Provision of fabrication, Hook up and pre-commissioning E&I services for SELASHA, estimated weight is 450MT, comprises of Main deck, Cellar &Sub Cellar deck including Solar power array & batteries, EDG, power distribution panel, Utility equipment and System panel, Pumps, Electrical & Instrument equipment / devices.

Supply of Fuel Gas Skid-Gadong Power Station 2, BPC

Scope of Work: Supply of Fuel Gas Filter Skid and Fuel Gas Heater including Engineering, Procurement, Fabrication, Tie-in and Commissioning comprises of Coalescing fuel gas filter, SDV, PSV, SRV, DBBV, Field equipment, etc. and PLC control system. Flow rate: 23kg/sec and operating pressure 22.4 bar.

Project F22 2024

Scope of Work: Supply of Fuel Gas Filter Skid and Fuel Gas Heater including Engineering, Procurement, Fabrication, Tie-in and Commissioning comprises of Coalescing fuel gas filter, SDV, PSV, SRV, DBBV, Field equipment, etc. and PLC control system. Flow rate: 23kg/sec and operating pressure 22.4 bar.

Project F27 2024

Scope of Work: Provision of fabrication, Hook up and pre-commissioning E&I services for F27, estimated weight is 480MT, comprises of Main deck, Cellar & Sub Cellar deck including Solar power array & batteries, EDG, power distribution panel, Utility equipment and System panel, Pumps, Electrical & Instrument equipment / devices.

Topsite for PTTEP’s Sarawak SK309 Development, Kuching, Malaysia

Scope of Work: Provision of E&I Installation works for Pemanis satellite (PESA) Topside For PPTEP’S Sarawak SK309 Development, estimated weight is 700 MT, comprises of Main deck, Cellar deck, Sub Cellar Deck & Close Drain Access Deck including Diesel Generator, Solar power array & batteries, power distribution panel, Utility equipment and Telecommunication System, Control & System Cabinet, Pumps, Navigation System, Electrical, Instrument and Fire & Gas equipment / devices.

Wellhead Platform for BKD-A Tie-In at BNCPP-B Topsites, Kuching, Malaysia

Scope of Work : Provision of E&I Installation works for Wellhead platform for BKD-A and Host tie in modification at BNCPP-B Topside, estimated weight is 700 MT, comprises of Main deck, Wellhead Deck, Cellar deck, Sub Cellar Deck, Sump Deck & Sea Deck including Diesel Generator, Solar power array & batteries, power distribution panel, Utility equipment and Telecommunication System, Control & System Cabinet, Pumps, Navigation System, Electrical, Instrument and Fire & Gas equipment / devices

Brunei Fertilizer (NH3) Project

Scope of Work : Instrumentation works including project management, field equipment calibration and  installation, excavation, cable tray ladder installation, cable laying and termination, JB/Panel/ system installation, pre commissioning and assist to commissioning.