Wellhead Platform for BKD-A Tie-in at BNCPP-B Topsites, Kuching, Malaysia

2020

Main Contractor: Mogic (S) Pte Ltd / KKB

End User: Petronas Carigali Sdn. Bhd.
 
Scope of Work: Provision of E&I Installation works for Wellhead platform for BKD-A and Host tie in modification at BNCPP-B Topside, estimated weight is 700 MT, comprises of main deck, wellhead deck, cellar deck, sub cellar deck, sump deck & sea deck including diesel generator, solar power array & batteries, power distribution panel, utility equipment and telecommunication system, control & system cabinet, pumps, navigation system, electrical, instrument and fire & gas equipment / devices.

Previous
Topsite for PTTEP's Sarawak SK309 Development, Kuching, Malaysia
Next
Brunei Nedo Hydrogenation Demonstration (BND) Project, Spark, Brunei