CPRA Gas Detection Panel Refurbishment

2010

Scope Of Works: Provision of Minor Engineering, Procurement of necessary equipment, Installation and re-wiring the overall systems. Scope included FAT, Pre-Commissioning and offshore Commissioning support.

Previous
Lumut Power Plant – New 2500A Incomer Panel of Gas Generator
Next
Selangkir Platform (SKID) Electrical Equipment Room (EER) & Local Control Room (LCR) – Non Pressurised