LFSIA

LFSIA
  • Home
  • Profile
  • Services
  • Portfolio
  • Resources
  • Job Opportunities
  • Events
  • Contact
TOPSITE FOR PTTEP’S SARAWAK SK309 DEVELOPMENT, KUCHING

TOPSITE FOR PTTEP’S SARAWAK SK309 DEVELOPMENT, KUCHING

WELLHEAD PLATFORM FOR BKD-A TIE-IN AT BNCPP-B TOPSITES, KUCHING

WELLHEAD PLATFORM FOR BKD-A TIE-IN AT BNCPP-B TOPSITES, KUCHING

BRUNEI NEDO HYDROGENATION DEMONSTRATION (BND) PROJECT, SPARK, BRUNEI.

BRUNEI NEDO HYDROGENATION DEMONSTRATION (BND) PROJECT, SPARK, BRUNEI.

Gallery One

Gallery One

Gallery Two

Gallery Two

Gallery Three

Gallery Three

LFSIA

INDUSTRIAL AUTOMATION

Home / 2008

Category: 2008

25 Nov

Detection System at Al Baraka Drilling Burge For BSP Mampak 1 CPRA Project

by admin in 2008
Detection System at Al Baraka Drilling Burge For BSP Mampak 1 CPRA Project

cpra2_08_1 cpra2_08_2

Scope Of Works: Provision of Technicians to carry out CPRA Gas Detection System Commissioning Works.

25 Nov

Gas Detection System at Measrk Convicer Singapore For BSP CPRA Project

by admin in 2008
Gas Detection System at Measrk Convicer Singapore For BSP CPRA Project

cpra_08_1 cpra_08_2

Scope Of Works: Provision of Technician to carry out CPRA Gas Detection System Installation & Commissioning Works.

25 Nov

BSP NGCP Plant Compressor Control Corporation (CCC) Project.

by admin in 2008
BSP NGCP Plant Compressor Control Corporation (CCC) Project.

ngcp_08_1 ngcp_08_2

Scope Of Works: Supply and Installation Of Field Instruments, signal Cables and CCC Equipment, Loop-Check and Pre-Commissioning and Assist CCC Vendor’s for Commissioning.

25 Nov

Supply Of Containerized Equipment Rooms (CER) For Onshore / Offshore Location – Bugan Platform Project (BUDP-01) Electrical Equipment Room (EER) & Local Control Room (LCR) – Pressurised

by admin in 2008
Supply Of Containerized Equipment Rooms (CER) For Onshore / Offshore Location – Bugan Platform Project (BUDP-01) Electrical Equipment Room (EER) & Local Control Room (LCR) – Pressurised

buganEE buganEER_LCR2

Scope Of Works: Provision of Overall Site Project Management, Installation,System Integration and Pre-Commissioning of CERs Electrical, Control & Automation and HVAC (Pressureized) Systems and Assist in Offshore Commissioning for this EPC Project.

25 Nov

TOTAL MLJ-206 Well Tie-in Project and Bleeding Line Safeguarding System for MLJ1 & MLJ2.

by admin in 2008
TOTAL MLJ-206 Well Tie-in Project and Bleeding Line Safeguarding System for MLJ1 & MLJ2.

totaloffshore_08_1 totaloffshore_08_2

Scope Of Works: Provision of Manpower for Onshore fabrication of Support Bracket & Stands, Hook-Up of Well Head Control Panels & Calibration of Field Instruments, Offshore Instrumentation Installation, Modification of Well Head Control Panels, Pre-commissioning and Commissioning.

25 Nov

Supply Of Containerized Equipment Rooms (CER) For Onshore / Offshore Location – Magpie Platform Project (MGCP-01) Electrical Equipment Room (EER) & Local Control Room (LCR) – Non-Pressurised

by admin in 2008
Supply Of Containerized Equipment Rooms (CER) For Onshore / Offshore Location – Magpie Platform Project (MGCP-01) Electrical Equipment Room (EER) & Local Control Room (LCR) – Non-Pressurised

MagpieEER_LCR1 MagpieEER_LCR2

Scope Of Works: Provision of Overall Site Project Management, Installation, System Integration and Pre-Commissioning of CERs Electrical, Control & Automation and HVAC (Non-Pressurized) Systems and Assist in Offshore Commissioning.

25 Nov

Supply Of Containerized Equipment Rooms (CER) For Onshore / Offshore Location – Magpie Platform Project (MGCP-01) Generator Equipment Room (GSR) – Non-Pressurised

by admin in 2008
Supply Of Containerized Equipment Rooms (CER) For Onshore / Offshore Location – Magpie Platform Project (MGCP-01) Generator Equipment Room (GSR) – Non-Pressurised

MagpieGSR1 MagpieGSR2

Scope Of Works: Provision of Overall Site Project Management, Installation, System Integration (Included Solar Turbine Generator Control System) and Pre-Commissioning of Electrical, Control & Automation and HVAC (Non-Pressurized) Systems and Assist in Offshore Commissioning.

Recent Posts

  • TOPSITE FOR PTTEP’S SARAWAK SK309 DEVELOPMENT, KUCHING
  • WELLHEAD PLATFORM FOR BKD-A TIE-IN AT BNCPP-B TOPSITES, KUCHING
  • BRUNEI NEDO HYDROGENATION DEMONSTRATION (BND) PROJECT, SPARK, BRUNEI.
  • D28JT-A PLATFORM PROJECT, KUCHING, MALAYSIA
  • Bunga Pakma A Wellhead Riser Platform Project- Kuching, Malaysia

Recent Comments

    Archives

    • September 2021
    • June 2019
    • September 2017
    • March 2016
    • November 2015

    Categories

    • 1997
    • 1998
    • 1999
    • 2000
    • 2001
    • 2002
    • 2003
    • 2004
    • 2005
    • 2006
    • 2007
    • 2008
    • 2009
    • 2010
    • 2011
    • 2012
    • 2013
    • 2014
    • 2015
    • 2017
    • 2018
    • 2019
    • 2020
    • 2021

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org

    ONE STOP COMPLIANCE SOLUTION PROVIDER

    • Home
    • Profile
    • Services
    • Portfolio
    • Resources
    • Job Opportunities
    • Events
    • Contact