24 Sep

TOPSITE FOR PTTEP’S SARAWAK SK309 DEVELOPMENT, KUCHING

TOPSITE FOR PTTEP’S SARAWAK SK309 DEVELOPMENT, KUCHING

Scope of Work : Provision of E&I Installation works for Pemanis satellite (PESA) Topside For PPTEP’S Sarawak SK309 Development, estimated weight is 700 MT, comprises of Main deck, Cellar deck, Sub Cellar Deck & Close Drain Access Deck including Diesel Generator, Solar power array & batteries, power distribution panel, Utility equipment and Telecommunication System, Control & System Cabinet, Pumps, Navigation System,  Electrical, Instrument and Fire & Gas equipment / devices.

 

Main Contractor: Mogic (S) Pte Ltd / KKB

End User: PTTEP Sarawak Oil Limited.

17 Sep

WELLHEAD PLATFORM FOR BKD-A TIE-IN AT BNCPP-B TOPSITES, KUCHING

WELLHEAD PLATFORM FOR BKD-A TIE-IN AT BNCPP-B TOPSITES, KUCHING

Scope of Work : Provision of E&I Installation works for Wellhead platform for BKD-A and Host tie in modification at BNCPP-B Topside, estimated weight is 700 MT, comprises of Main deck, Wellhead Deck, Cellar deck, Sub Cellar Deck, Sump Deck & Sea Deck including Diesel Generator, Solar power array & batteries, power distribution panel, Utility equipment and Telecommunication System, Control & System Cabinet, Pumps, Navigation System,  Electrical, Instrument and Fire & Gas equipment / devices

Main Contractor: Mogic (S) Pte Ltd / KKB

End User: Petronas Carigali Sdn. Bhd.